9000 Block Sewer Study
This project included the analysis of the existing sewer system downstream of the 9000 Block development located on Schofield Barracks. The Army is planning to develop the 9000 Block development and have found that there are surcharging pipes downstream which require improvement. Project highlights included identify and review the condition of the existing sewer system, model and analyze sewer flows based on existing and proposed redevelopment densities, identify surcharging pipes and "choke" points in the existing system and options for sewer relief, and outlining recommendations in a technical memo.