Manoa Sewer Rehabilitation
Flow monitoring included the determination of proposed flow monitoring basins, coordination of proposed flow monitoring basins with the Department of Design and Construction, and USI temporary flow monitoring (by sub-consultant).
Stream Siphon Cleaning and CCTV involved the review of CCTV data, coordination of work with sub-consultants. The project also involved the topside (non-entry) sewer man hole inspection to assess the condition of the man holes, and review of existing hydraulic conditions.
Stream Siphon Cleaning and CCTV involved the review of CCTV data, coordination of work with sub-consultants. The project also involved the topside (non-entry) sewer man hole inspection to assess the condition of the man holes, and review of existing hydraulic conditions.