Moiliili-Kapahulu Sewer Rehabilitation
This project involved both the planning and design phase. The objective of the project was to correct current structural and/or hydraulic deficiencies in a portion of sewer line along Date Street. Highlights included rehabilitate/reconstruct approximately 4,200 linear feet of sewer, installation of 4,000 linear feet of sewer along Date Street.
Planning Phase included the study of 6,800 linear feet of existing sewer main from 14" to 42" diameter via CCTV video and 42 man holes along Date Street, man hole and pipeline assessments done via NASSCO's MACP and PACP reports, and review alternatives for rehabilitation and reconstruction and preparation of a Design Alternatives Report (DAR).
Planning Phase included the study of 6,800 linear feet of existing sewer main from 14" to 42" diameter via CCTV video and 42 man holes along Date Street, man hole and pipeline assessments done via NASSCO's MACP and PACP reports, and review alternatives for rehabilitation and reconstruction and preparation of a Design Alternatives Report (DAR).