Puuloa Road Improvements
This project included a widening of a two-lane roadway to three travel lanes. Improvements included dedicated left-turn lanes, bike lanes, drainage system, overhead utilities relocation, off-street parking lot, highway lighting system, traffic signal upgrades, and property adjustments. Major challenges was to phase the construction to accommodate existing traffic during construction of this heavily used facility.